Senior Product Designer

I make complex, demanding products simple.

Based in Nantes, FR
Focus B2B SaaS, Design System, AI
Experience 7+ yrs
Status Open

Over the last 7 years, I've contributed to the design and improvement of B2B SaaS products, alongside teams at Oplit (industrial schedulers), PrestaShop (300k+ merchants), Airbus and SNCF. I've led design systems, run audits, and shipped infrastructure that teams build on.

What I'm looking for: high-stakes products where design co-pilots strategy, not a service function.

How I work

Four moments, always in the same order. The first one is the one people skip.

  1. 01

    Discovery

    Interviews, shadowing, usage data. Finding what actually blocks people rather than what we assume blocks them.

  2. 02

    Design

    Flows, patterns, components, edge cases. Specs that still hold up once they reach engineering.

  3. 03

    Build

    Working alongside engineering: design system, tokens, prototypes that serve as the reference.

  4. 04

    Ship

    Deploy, track, iterate on real usage. A feature nobody measures is a feature nobody learns from.

Who am I?

I came to design without really noticing it.. first through the games I played, then something deeper that stuck: a curiosity for graphic systems and the drive to build the things that had gradually fascinated me.

Senior Product Designer at Oplit, a B2B SaaS platform for industrial scheduling. I design for planners and shop-floor operators in luxury watchmaking, aerospace, and precision engineering. Expert users, direct operational impact. I took over and deployed Oplit's design system as a structural element of the organization, aligning design, engineering, and product around a shared language.

What interests me: SaaS environments where design shapes how organizations work. A decision framework that holds, a component system that speeds up the team, research that redirects a roadmap. I'm looking for roles where design co-pilots product strategy.

Professional Experiences

Sept. 2025 - Sept. 2026
Senior Product Designer Oplit
+

+74% active users (430 → 747) and key features now running on customers' production lines.

Oplit builds production planning software for industrial manufacturers in aerospace, luxury and automotive. I owned design on the product: continuous discovery with customers and prospects, strategic features shipped with product and engineering, and the design system I rebuilt (44 components, structured for AI-assisted workflows) which made design execution 30 to 50% faster.

June 2022 - Sept. 2025
Product Designer PrestaShop
+

Product Designer & Design System Lead (2024)

Progressively structures and deploys the research system across PrestaShop. Responsible for structuring and making the tools, templates, and user data operationally available so product teams can access them quickly and efficiently. The aim is to provide efficient access to user search when designing PrestaShop products for our 300k+ merchants.

Also working on structuring the Design System to make it robust, flexible and scalable. Proposing areas for development, structuring the team around the project and giving visibility to what we're doing.

Design System contributor (2023)

Involved in structuring and implementing the PrestaShop Design System. Working on the monitoring, implementation, and use of components and design tokens by everyone who uses the design system, as well as the components designed by the Product Designers.

Product Designer (2022)

Within the Customer Platform team, working on the design and improvement of the user experience through the user account and, more generally, the login experience.

June 2021 - June 2022
UX/UI Designer BeApp
+

In charge of UX at Beapp, working mainly with the UI designer and in contact with all the people involved in the various customer projects (PO, Business, Tech).

Designing experiences for different types of clients in the healthcare, automotive, food, institutional, and other sectors. Running creativity, immersion, and co-creation workshops. In charge of user research and testing.

Oct. 2020 - June 2021
UX Designer Consultant La Capsule
+

Work as a UX consultant for companies looking to improve their user experience.

Sept. 2018 - Aug. 2020
UX Designer , Work-study Airbus Atlantique
+

Joined the team of UX/UI designers (UXiD) as part of a process to digitalize the Airbus Group. The team designs and redesigns processes as well as business applications and HMIs, putting people back at the heart of their design.

Responsible for disseminating UX guidelines and best practices throughout the group. Collecting user requirements, participating in the design of business applications, organising information architecture, and working in collaboration with IT and other departments.

March 2018 - Aug. 2018
UX Designer , Internship SNCF
+

Working as a UX designer in section 574 (innovation) at the SNCF in Nantes. In charge of designing personas, user paths, and screen ergonomics for different applications.

Aug. 2015 - Sept. 2017
UX Designer , Work-study StéreoSuper
+

An apprentice for 2 years and trained as a web designer with a specialization in UX design, working on several projects and building up solid experience in a field I'm passionate about.

Other experiences

2025 - Present
Teacher Ecole de design Nantes Atlantique
+
  • 1st year: Design & UX/UI fundamentals
  • 2nd year: Figma training
2024 - Present
Mentor ADPList
+

Helping designers, no matter their seniority, to grow and giving them feedbacks about their projects or career perspectives.

2021 - Present
Speaker & Jury ECV Nantes
+
  • Design System workshop with M1 UX: building a foundation & understanding the need for a design system (2026)
  • Jury M2 UX: end-of-study projects (2026)
  • Eco-design & Design System 2023, 2024, 2025 (Speaker)
  • Design System '22-'23 (Annual project), 100% students graduated
  • User Research Methods '21-'22 (Lecturer)
2020 - Present
Freelancing
+

Studies

2017 - 2020
ECV Nantes
+

Master 2, UX Design
Bachelor, Design (L3)

2015 - 2017
CESI Nantes
+

Web-Concepteur

Articles

I have written a few articles on various subjects, such as design, design systems, and user research.

Guillaume CAILLET on Medium →

Curriculum Vitae

Download CV (PDF) →
← Back to projects
Case Study PrestaShop

PrestaShop Design System

Structuring and development of the PrestaShop Design System. Provide product and core teams with access to a system that enables them to design coherent, fluid and easily structured experiences.

Design System Product Design Research UI Design UX Design
100% of product squads use the DS in design
80% adoption in tech teams
-50% reduction in development time

Context

When I joined in June 2022, the PrestaShop "design system" was a set of advanced UI kits in Figma, not shared as a true library. Product designers worked with their own components, tech teams used a separate framework, and interface consistency was weak.

With multiple touchpoints (main product, help center, marketplace, academy), alignment was critical to scaling both product and brand.

Approach

  • Structured the design system team and implemented shared ownership around a unified workflow.
  • Set up contribution processes, component review cycles, and regular design-tech alignment meetings.
  • Built a transparent Kanban in Notion, accessible to both design and tech, to track every component request and status.
  • Audited the existing system and produced actionable recommendations to realign the system for future growth.
  • Pushed adoption of documentation standards, making documentation a Go/No-Go criterion for any new component.
  • Introduced and started implementing design tokens, following best practices for primitive and semantic layers.

Outcome

  • Implementation of design/tech contribution processes, documentation, comprehensive auditing, governance, and shared Kanban.
  • Initial implementation of design tokens on test projects (inspired by Nathan Curtis).
  • Reduction in design/documentation debt, alignment with tech on nomenclature.

What's next

  • Ongoing documentation standardization across all components.
  • Rollout of experience libraries for specialized squads, maintaining brand and UX alignment.
  • Continued monitoring of DS adoption and iteration of governance processes.
← Back to projects
Case Study PrestaShop

PrestaShop Customer Account

Unifying three fragmented PrestaShop accounts (Back Office, Marketplace, Business Care) into one, so users finally stop calling support to update an email.

Product Design Prototyping Research UI Design
3 → 1 accounts unified into a single customer account
0 support requests needed for basic account updates
Kano basic need, structured as infrastructure, not feature

Context

Back Office, Employee profile page
Back Office, Employee profile (before)
Marketplace Addons, Account page
Marketplace Addons, Account (before)
Unified account, Account settings (before)
Account settings (before)
Mixpanel, Origin of connections to customer account
Mixpanel, Origin of connections to customer account

Research & Discovery

Decisions & Trade-offs

Collaboration

Design Solution

Unified account, Personal information
Unified account, Personal information
Unified account, Business information
Unified account, Business information
Unified Customer Account, Final design
Unified Customer Account, Final design

Outcome & Measurement

← Back to projects
Case Study PrestaShop

PrestaShop Expert Experience

When design becomes the instrument of a strategic decision: reshaping a stalled partner portal and a devalued certification, and turning a fuzzy, high-stakes problem into a system of defensible decisions.

Product Design Discovery · FOCUSED Strategy Certification
25% real engagement on the Expert portal it was meant to power
22% of experts certified, for a certification no longer taken seriously
Build the option chosen: optimise / buy / build the partner portal

Context

Strategic Decision

LA DÉCISION STRATÉGIQUE Optimiser · Acheter · Construire Le design a servi de boussole pour trancher, brique par brique. OPTION 01 Optimiser Garder l'outil existant et l'améliorer. Écarté · dette structurelle OPTION 02 Acheter S'appuyer sur une solution tierce spécialisée. Retenu · plateforme de certif. OPTION 03 Construire Développer un produit en interne. Retenu · portail partenaires Portail partenaires → Construire en interne (remplace la solution tierce) Plateforme d'examen → Acheter (prestataire : examens surveillés, vérif. d'identité) Décision de portail actée après mon départ · liberté et maîtrise de l'itération
Mapping de la décision : construire le portail en interne, acheter la brique d'examen.

Collaboration

Methodology

MÉTHODE FOCUSED, de bout en bout Chaque étape rattachée à une contribution design concrète. F Frame 2 briefs O Observe entretiens C Claim proposition de valeur U Unfold moments-clés S Steal Adobe · Shopify · Google E Execute conception + proto (100%) D Decide recos MVP RÔLE Présent de la discovery au prototype · réalisation design attribuée à 100 %. Product Trio : PM · Designer · Lead Dev, sous cadrage de la Lead Designer.
La méthode FOCUSED, de la discovery au prototype.
Userflow de discovery cartographiant les parcours gratuit, payant et développeur, avec impasses et boucles
Userflow de discovery : tous les chemins cartographiés (gratuit, payant, parcours développeur) avant la mise en écrans.

Findings

Decisions & Trade-offs

DÉCISION DE CONCEPTION Du flou à deux niveaux nets Remplacer un dégradé d'étoiles illisible par une frontière claire. AVANT « Rejoindre » · « badge » · « expert » 1 / 2 / 3 étoiles · « certifié » Confus pour les experts comme en interne. NIVEAU 1 · GRATUIT PrestaShop Expert / Membre Déclare ses boutiques · cumule des points « Salle d'attente » Aucune reconnaissance ni visibilité annuaire NIVEAU 2 · PREMIUM · 1 000 €/AN PrestaShop Certified Expert Tous les bénéfices · visibilité annuaire Accompagnement · badge partageable 1 certification incluse par an paiement
Deux niveaux lisibles remplacent un dégradé de statuts confus.

Design Solution

CADRAGE PRODUIT Cinq points de contact prioritaires La colonne vertébrale du parcours, de la découverte au renouvellement. 01 Découverte du programme free / premium 02 Assignation & invitation du développeur 03 Évaluation examen surveillé 04 Suivi dashboard 05 Renouvel- lement Insight directeur : l'expérience du Channel Manager (interne) conditionne celle de l'Expert (externe).
Cinq points de contact, structurés autour de l'insight Channel Manager / Expert.
Onboarding, étape de souscription au programme Expert+
Onboarding, rejoindre le programme Expert+
Comparatif d'offres et abonnement Expert+
Comparatif d'offres, abonnement Expert+
Certification, page de découverte
Certification, page de découverte
Certification, page de détail (premium)
Certification, page de détail (premium)
Sélection et invitation d'un développeur de l'équipe
Sélection et invitation d'un développeur
Dashboard de suivi, certification en attente
Dashboard de suivi, certification en attente
Dashboard de suivi, agence certifiée
Dashboard de suivi, agence certifiée
Vue d'ensemble du parcours de certification complet
Parcours de certification complet, vue d'ensemble
Vue d'ensemble du parcours d'onboarding complet
Parcours d'onboarding complet, vue d'ensemble

Reflection

← Back to projects
Case Study PrestaShop

Sign in / Sign up Flow

Cutting authentication errors in half by redesigning sign-in across the entire PrestaShop ecosystem (back office, marketplace, help center).

Product Design Prototyping Research UI Design
-50% authentication errors (7k avg vs 15k before)
-50% flow length reduction
50% of logins via Google SSO within 6 months

Context

Research & Discovery

Sign in/Sign up, Research and user flows
Research, User flows and integration mapping

Decisions & Trade-offs

Collaboration

Design Solution

Sign in, New unified login page with Google SSO
Sign in, "Continue with Google" prioritized, unified login
Sign up, Simplified account creation
Sign up, "Sign up with Google" + simplified form
Sign up, Full flow in 3 steps
Full sign up flow, from account creation to account settings
Sign up, Complete flow with freelance/agency variant and account settings
Flow overview, signup, profiling steps, freelance/agency variant, account settings

Outcome & Measurement

Mixpanel, Credentials vs Google SSO comparison graph
Mixpanel, Credentials vs Google SSO adoption (solid = post-redesign, dashed = before)
← Back to projects
Case Study PrestaShop

Store Association Flow

Redesign of the association flow between the user account and the shop, making it transparent and error-resistant.

Product Design Prototyping Research UI Design
600+ successful associations per day
~-40% estimated drop in error-driven abandonment

Context

The shop association process, particularly for open-source installations, was a major source of confusion. Merchants didn't understand why association was required and abandoned the process, especially when errors occurred.

The association exists because most users have Open Source shops installed locally on their hosting, not always identified as belonging to the owner account. Association creates this connection.

Approach

  • Conducted research to identify key pain points and abandonment triggers.
  • Redesigned the flow to require only the necessary information, providing clear guidance and error correction.
  • Modeled the new process on the SaaS "Edition" experience, offering seamless association for recognized shop owners.
  • Prototyped the new flow (including a demonstrative video) and validated improvements with stakeholders.
Store Association, Research and flow mapping
Research, Flow mapping and wireframes
Store Association, Current production flow
Current production flow, Association success path
Store Association, New workflow
New association workflow, Simplified steps
Prototype, End-to-end walkthrough of the redesigned association flow

Outcome

  • Major improvement in user comprehension and reduced frustration.
  • Most shop traffic now flows through the updated payment platform and onboarding.
  • Unified the experience with the "Edition" SaaS model for consistency.
← Back to projects
Case Study Oplit · Opal DS

Oplit, Opal DS · Corrective Actions

Executing the design system remediation plan: rebuilding 44 components, applying 2,634 token bindings, and establishing a dev-alignment workflow that accelerates feature delivery by 20-30%.

Design System Design Ops Automation Figma MCP
92 → 2 634 token bindings applied
9% → 100% component compliance rate
44 components rebuilt · 0 hardcoded values

Execution

Before
box-shadow: 0 2px 8px #3f64ff40;
background: #3f64ff;
border: 1px solid #1a1a2e;
→
After
box-shadow: {shadow.button.default};
background: {color.brand.primary.default};
border: 1px solid {color.neutral.900};

Automation

Dev Alignment

🎨
Figma
Design + tokens
→
📄
Notion
States, variants, props
→
📚
Storybook
Dev review
→
✓
Linear
Ticket closed

Outcome

← Back to projects
Case Study Oplit · Opal DS

Opal DS · AI Prototyping Skills

The morning my PM took a prototype to a client without me. Two AI skills that let the design system build screens from a plain-language brief, and what that did to the craft.

Design System Design Ops AI Skills Figma MCP Prototyping
1 morning from a brief to a client-ready prototype
2 skills operator + builder, design-system aware
11 screens · 4 modals generated from a brief, no manual design step

The profession is shifting

Problem

Audit at T0: no single source of truth, heavy UI debt, zero Figma-dev parity
The starting point at the audit (T0, Nov 2025): no single source of truth, ~90% UI debt, zero Figma-dev parity. The diagnosis was bad.
Audit T0 design debt: foundations coverage and two competing Figma libraries
Design debt: foundations coverage (Typography, Shadows, Breakpoints absent) and two competing Figma libraries.
Audit T0 dev debt: 3 icon libraries, Vuetify bypassed, no Storybook
Dev debt: 3 icon libraries, Vuetify bypassed with heavy overrides, no Storybook, no shared token repo.
Audit T0 cross-cutting debt: the design-to-dev gap
The most critical debt is cross-cutting: no Figma-to-code bridge, no parity, no governance. Design-dev alignment became the top priority.

Approach

Architecture: how the operator and builder skills connect
How the two skills connect: live sources feed the operator (the knowledge), which feeds the builder (screen construction), under a human gate.

The new craft

Three versions of the same screen: product reference, build v1, build v2
The same screen in three states: real product, build v1, build v2. The gap between v1 and v2 is where the craft sits.
Iterations: audit, corrective actions, build v1, diagnostic, build v2, autonomous PM use
How we reached the current skills: a clean-room loop where every fact is verified live and every version tested by a blank, memoryless agent.

Outcome, measured honestly

Live health tracker: Design 97, Dev 25, Product 10
The live tracker after corrective work: the design side is now solid (97), but product adoption stays low (10). That gap is the case for this project.
In-progress flow generated in 4 states
A full 4-step flow generated from a brief, with real Form components.
Full settings flow: 11 screens and 4 modals
11 screens, 4 modals, a whole system, no manual design step.

Impact

The uncomfortable part

What I keep

The reusable value chain: brief, builder, real components, faithful prototype, handoff that holds
The reusable value chain: any team with a documented DS can deploy these skills on its own system.
← Back to projects
Case Study Tooling

Figma Plugin, Local Components Collector

A JavaScript plugin built with the Figma Plugin API to automate local component audits, reducing DS audit time from days to hours.

Tooling JavaScript Figma Plugin API Design Ops
days → hours DS audit time reduction
0 manual file navigation needed
Solo shipped without engineering bandwidth

Problem

Approach

How it works

Local Components Collector ✕
ComponentUsagePriority
Button/Primary×12HIGH
Card/Item×8HIGH
Icon/Arrow×5MED
Tag/Status×3LOW

Impact

← Back to projects
Case Study Oplit · Opal DS

Oplit, Opal DS · Audit

A systematic Opal DS audit, graded findings against four industry frameworks, with a phased remediation plan I executed over the following months.

Design System Audit Design Ops
3 levels severity grading
3 horizons remediation plan
4 frameworks Atomic Design · BEM · DTCG · WCAG

Context

Methodology

Audit synthesis at T0: token maturity, UI/DS debt, no single source of truth, zero Figma-dev parity
The audit at T0 (Nov 2025): the global verdict in one screen, with the six structural points it revealed.

Findings

Design debt at audit: foundations coverage and two competing Figma libraries
Design debt: foundations coverage (Typography, Shadows, Breakpoints absent) and two competing Figma libraries.
Dev debt at audit: 3 icon libraries, Vuetify bypassed, no Storybook
Dev debt: 3 icon libraries, Vuetify bypassed with heavy overrides, no Storybook, no shared token repo.
Cross-cutting debt: the design-to-dev gap, the most critical finding
The most critical debt is cross-cutting: no Figma-to-code bridge, no parity, no governance. Design-dev alignment became the top priority.

Remediation Plan

← Back to projects
Case Study Oplit

Capacity Transfer Between Sectors

From 8 manual steps in Excel to 1 action with real-time feedback, enabling a major automotive manufacturer to unlock multi-site deployment.

Product Design Industrial SaaS Co-creation Interaction Design
Deployed feature live and adopted
Weekly consistent usage since launch (Mixpanel)
10+ sites multi-site deployment unblocked
3.5 months discovery to production with a 3-person team

Context

Research & Discovery

Decision flow diagram, load rate and stock verification logic
Decision flow, Manufacturing tab → Stock tab, load rate OK/NOK and stock OK/NOK conditions

Decisions & Trade-offs

Collaboration

Design Solution

Sector at 200% load rate, stock view with rupture alerts and production targets
Before transfer, Sector 1 at 200% load rate, stock rupture alert, production targets
Transfer modal, destination selection with load rate display
Transfer modal, pre-filled info, destination selection with current load rate (15%)
Sector 1 after transfer, partial transfer tag and adjusted production target
After transfer, Sector 1: "Partial transfer" tag, "To Sector 2 ↗" link, target adjusted from 90 to 45
Sector 2 after transfer, received transfer tag with hatched stock bars
After transfer, Sector 2: "Transfer received" tag, "From Sector 1 ↗" link, hatched stock bars
Full design board, all sections organized
Design board overview, Stocks, Sector origin, Transfer adjustments, Actions, Sector destination

Outcome & Measurement

← Back to projects
Case Study Oplit

Oplit, Multi-select & Sticky Action Bar

One coupled pattern: multi-select triggers a sticky action bar, so schedulers can update 50 work orders in one click instead of fifty. Same behavior across cards and Gantt views.

Industrial SaaS Interaction Design Pattern Design Component Design
2,250 bulk actions in first 30 days (Mixpanel)
4 views consistent behavior across cards & Gantt
~7 days design / 4 months to production
50-100 min/week saved per planner (estimated)

Context

Research & Discovery

Decisions & Trade-offs

Collaboration

Design Solution

Multi-select across Suivi d'avancement cards (per PDC, multi-PDC, status update) and Gantt view
Multi-select in context, Suivi d'avancement (cards) per PDC, multi-PDC, status update · Gantt view
Sticky action bar, annotated specifications
Sticky action bar, annotated specs: full bar, capacity-aware variant, secondary actions menu, loading state

Outcome & Measurement

Mixpanel dashboard, Multi-select usage by action type over 30 days
Mixpanel, Multi-select usage by action type (30 days) + distribution by client/user (2,250 total)